| Equalization Basins, Eldora, Iowa
Designed and provided construction supervision for two equalization basins with total capacity of 2 million gallons. Basins were designed to manage peak flows caused by inflow and infiltration(I&I) during high rainfall events. Facilities included lined basins, pump station, piping and controls. Completed in 2001.
|